PROJECT REFERENCES
Vis Viva GSM favicon

GEOTHERMAL PROJECTS AND OTHERS

We are proud of our extensive portfolio of projects in the geothermal energy and hydrocarbon exploration sectors. Our projects include the development of conceptual and detailed mining designs, drilling management, and expert supervision across multiple exploration and production fields in the Republic of Croatia.

SAVA-06 HYDROCARBON EXPLORATION FIELD

  • Organization and consulting services for Aspect Croatia
  • Preparation of conceptual design for exploration wells within the 3D area in the Sava-06 exploration block
  • Preparation of the exploration well design Setuš-2
  • Participation in the preparation of 14 exploration well projects in the Sava-06 hydrocarbon exploration area (drilling discipline engineer)
  • Participation in obtaining the Environmental Impact Assessment approval for the Sava-06 area
  • Participation in the drilling of exploration wells:
    • Setuš-2
    • Trebarjevo-1
    • Ljubljanica-1
    • Topolje-1

KORENOVO GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the Korenovo GT-1 geothermal exploration well
  • Preparation of the exploration geothermal well project Korenovo GT-1
  • Preparation of the conceptual mining project for the development and exploitation of the Korenovo geothermal production field
  • Drilling supervision during the execution of the Korenovo GT-1 geothermal well
  • Preparation of technical documentation for the tender procedure for turnkey well construction
  • Preparation of the detailed construction design for the site development of the Korenovo GT-1 exploration well
  • Preparation of the spatial planning compliance study

TEKIĆ GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the Tekić GT-1 geothermal exploration well
  • Preparation of the exploration geothermal well project Tekić GT-1
  • Preparation of the environmental protection report for the screening assessment on the need for an Environmental Impact Assessment (EIA) for the Tekić GT-1 exploration well

LIPIK GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the development and exploitation of the Lipik geothermal production field
  • Execution of test pumping of the Lipik GT-9 well in accordance with the Lipik GT-9 geothermal well project (hydrodynamic testing)
  • Preparation of the environmental protection report for the screening assessment on the need for an Environmental Impact Assessment (EIA) for the future “Lipik” production field
  • Preparation of the reserves report for the future Lipik geothermal water production field
  • Preparation of the spatial planning compliance study

SV. NEDELJA GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the Sveta Nedelja GT-1 geothermal exploration well
  • Preparation of the exploration geothermal well project Sveta Nedelja GT-1
  • Participation in obtaining location permits for the construction of geothermal wells
  • Preparation of the environmental protection report for the screening assessment on the need for an Environmental Impact Assessment (EIA) for the exploration well

DUGO SELO GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the Dugo Selo GT-1 geothermal exploration well

KRIŽEVCI GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the Križevčanka GT-1 geothermal exploration well
  • Preparation of the exploration geothermal well project Križevčanka GT-1
  • Preparation of the conceptual mining project for the development and exploitation of the Križevci geothermal production field
  • Preparation of the spatial planning compliance study
  • Preparation of the project documentation for obtaining a location permit

SLAVONSKI BROD GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining project for the Slavonski Brod GT-1 geothermal exploration well
  • Participation in obtaining location permits for the construction of geothermal wells
  • Preparation of the environmental protection report for the screening assessment on the need for an Environmental Impact Assessment (EIA) for the exploration well
  • Preparation of the project documentation for obtaining a location permit

BJELOVAR GEOTHERMAL WATER EXPLORATION FIELD

  • Preparation of the conceptual mining projects for the Bjelovar GT-1 and Bjelovar GT-2 geothermal exploration wells

DRILLING RIG PROJECTS

  • Preparation of the “Oil and Gas Engineering Project for the drilling rig MB T47”
  • Preparation of the “Oil and Gas Engineering Project for the drilling rig IDECO – SBS DIR 806 MB (R22)”
  • Preparation of the “Drilling Rig Project DRILLMEC MR8000”
  • Organization and execution of the procedure for obtaining the operating permit for the drilling rig MB T47, including the acquisition of the said permit
  • Preparation of the drilling rig project DRILLMEC 1500SS

BOŠNJACI GEOTHERMAL WATER PRODUCTION FIELD

  • Participation in the management of the production field

SV. NEDELJA GEOTHERMAL WATER PRODUCTION FIELD

  • Preparation of the supplementary development and exploitation project for geothermal water at the “Sveta Nedelja” geothermal production field – Supplement 1
  • Participation in the management of the production field
  • Design and installation of the wellhead (blowout preventer) equipment for the Nedelja-1 well
  • Execution of wellsite preparation works

SUPERVISION AND PARTICIPATION IN DRILLING

  • Execution of drilling supervision during the construction of the Korenovo GT-1 geothermal well
  • Participation in drilling supervision during the construction of the Podravska Slatina GT-6 geothermal well
  • Participation in drilling of exploration wells in the Sava-06 area:
    • Setuš-2
    • Trebarjevo-1
    • Ljubljanica-1
    • Topolje-1

PROFESSIONAL TRAINING, HSE & EQUIPMENT CERTIFICATION IN CROATIA

  • MB services
  • Olvisz
  • NRG med
CONTACT
EXPERT SUPPORT FOR YOUR GEOTHERMAL PROJECTS
CONNECT WITH US